Java 8 – HijrahDate, How to calculate the Ramadan date 修改教程

Ramadan is the 9th month of the Islamic calendar, the entire month.

1. HijrahDate -> Ramadan 2016

Full example to calculate the start and end of the Ramadan 2016

TestHijrahDate.java

package com.mkyong.date;

import java.time.LocalDate;
import java.time.chrono.HijrahDate;
import java.time.temporal.ChronoField;
import java.time.temporal.TemporalAdjusters;

public class TestDate {

    public static void main(String[] args) {

        //first day of Ramadan, 9th month
        HijrahDate ramadan = HijrahDate.now()
                .with(ChronoField.DAY_OF_MONTH, 1).with(ChronoField.MONTH_OF_YEAR, 9);
        System.out.println("HijrahDate : " + ramadan);

        //HijrahDate -> LocalDate
        System.out.println("\n--- Ramandan 2016 ---");
        System.out.println("Start : " + LocalDate.from(ramadan));

        //until the end of the month
        System.out.println("End : " + LocalDate.from(ramadan.with(TemporalAdjusters.lastDayOfMonth())));

    }

}

Output

HijrahDate : Hijrah-umalqura AH 1437-09-01

--- Ramandan 2016 ---
Start : 2016-06-06
End : 2016-07-05

References

  1. Wikipedia – Ramadan (calendar month)
  2. HijrahDate JavaDoc

如果觉得JSRUN的教程对您有用,请随意打赏。您的支持将鼓励JSRUN继续提供更好的服务

捐助JSRUN
JSRUN前端教程共编系统是国内最先开创的教程维护系统, 所有工程师都可以参与共同维护的本前端教程,让知识的积累变得统一完整、自成体系。 希望广大工程师能一起参与进共编,让零散在世界各处的知识点找到组织、找到家。
X
支付宝
9.99
请使用支付宝扫码支付, 有效时间 5分0秒
超过有效时间后请立即停止支付。
支付故障请联系QQ:565830900
因10.00元通道已占用,系统建议您支付9.99元
正在生成二维码, 此过程可能需要15秒钟
谢谢支持,我一定会更加努力的